Client:

Confidential

Case Category:

Banking and Finance

Time Frame:

60 Days

Status:

Win

Challenge:

A leading $6 Billion Manufacturing group wanted to integrate Six sigma methods in to their well established Lean culture

Solution:

In a pilot demonstration of integrated LSS, improved CpK of their star product from .33 to 1.66 CpK